Cross drainage design for over 70 km of Snowy 2.0 construction access roads
Project Owner
Snowy Hydro & Praxis
Location
Kosciuszko National Park, NSW
Completed
2021
Preliminary hydrology, hydraulics and cross drainage design supporting more than 70 km of construction access roads for the landmark Snowy 2.0 renewable energy project within Kosciuszko National Park.
Project Overview
Civil IQ was engaged by Praxis to develop the preliminary design for cross drainage infrastructure associated with the Snowy 2.0 construction access road network. The project supported the delivery of more than 70 kilometres of access roads linking major construction sites at Lobs Hole, Marica and Tantangara through the challenging terrain of Kosciuszko National Park.
Working alongside the broader road design team, Civil IQ prepared hydrological and hydraulic assessments, rainfall runoff routing, cross drainage layouts and drainage infrastructure designs to safely manage runoff while minimising environmental disturbance within the national park.
Challenges
- Designing drainage infrastructure across steep mountainous terrain.
- Coordinating hydrological modelling with the broader Snowy 2.0 project requirements.
- Managing significant elevation changes through specialised inlet, collector channel and energy dissipation designs.
- Minimising disturbance within Kosciuszko National Park while maintaining drainage performance.
Outcomes
- Delivered preliminary cross drainage designs for approximately 70 km of construction access roads.
- Developed practical hydrology and hydraulic solutions for a nationally significant renewable energy project.
- Supported efficient access to major construction sites while protecting surrounding environmental values.
Scope
- Rainfall runoff routing (DRAINS)
- Hydrology & hydraulics
- Cross drainage design
- 12d modelling
- Bill of quantities