Projects / 

Orbital Space Launch Facility

Stormwater management plan for the Bowen Orbital Space Facility

Project Owner

Gilmour Space

Location

Bowen

Completed

2022

Stormwater planning and assessment supporting the operational requirements of the Bowen Orbital Space Facility.

Project Overview

Civil IQ developed the Stormwater Management Plan for the Bowen Orbital Space Project to accompany the Overarching Environmental Management Plan and address the operational stormwater requirements established by the Office of the Coordinator-General.

The assessment reviewed the site’s as-constructed works to determine stormwater quantity and quality impacts relative to the existing scenario. The project required practical drainage solutions that could be integrated with infrastructure already constructed while satisfying planning approval requirements.

Challenges

  • $
    Determining the extent and condition of works already constructed
  • $
    Assessing stormwater quality and quantity impacts associated with the as-constructed infrastructure.
  • $
    Addressing the omission of a cross-drainage culvert at a low point along the access road.
  • $
    Sizing retrofit drainage infrastructure to integrate with existing works while remaining cost-effective and compliant with approval requirements.

Outcomes

  • $
    Completion of the Stormwater Management Plan in accordance with planning approval requirements.
  • $
    Satisfaction of the Office of the Coordinator-General’s operational stormwater requirements.
  • $
    Collaboration with Gilmour Space and the construction contractor to develop fit-for-purpose stormwater solutions suited to the as-constructed works.

Scope

  • $
    Rainfall runoff routing modelling using DRAINS
  • $
    Hydrology and hydraulics
  • $
    Stormwater quality and quantity assessments
  • $
    RPEQ certification

project images

Ready to discuss your next project?

We'd love to talk to you.